This was our third week at Crystal River UMC. Lots of work was accomplished during this week.
Donna & Nancy learned how to use the router & routed out for the hinges on the doors in the laundry room cabinets.
Lou worked on installing conduit for electrical wires.
Donna & Nancy helped take down Bethlehem & organize it for storage.
Marty worked on installing some of the new wiring.
Dennis got to use the ditch witch. He dug trenches for the electrical wire & water lines.
Donna free hand painted a new sign for the historic Bethel Chapel.
Donna & Nancy help to fill some of the trenches after the conduit was in place.
Dennis showed Anna how to use a power driver to repair the benches for the outdoor chapel.
Donna & Nancy filled the trench behind the cement block retaining wall that was built.
Dennis packed down the dirt in the trenches.
Nancy and Donna repainted the doors to the garbage dumpsters enclosures.
Marty pulled electric wire thru the buried conduit.
No comments:
Post a Comment