This was our third week at Hattiesburg, MS. We had two new units come in. We worked on two houses in Petal & one in Hattiesburg this week.
This was our team for the week. Les, Shelia & Frank, Sue, Nancy & Dennis, & Gary & Avis.
It was so cold that we held our team meeting & devotions inside the church.
Dennis cut & glued the laundry room & kitchen tile in place.
Sue & Les installed the cabinets in the kitchen
Les & Sue put in the door transition molding.
Sue & Les built a false wall for the kitchen counter
Frank painted ceilings at the house on Byrd street in Petal.
Shelia painted the trim & cut in around the ceilings at the same house.
Avis delivered poinsettias to all the owners of the homes in Petal we were working on this week
Gary & Dennis checked over the drywall ceilings at the house on Hwy 42 in Petal
Sue grouted the tiles on the kitchen & laundry room floor.
Nancy did lots of touch-up paint & painted the false cabinet wall.
Les installed trim around the back door & baseboard in the kitchen & living room.
Dennis installed the smoke detector & ceiling fan. We think we caught him reading the instructions!
Frank had a drone and sent it up to get this picture of the RV's in the parking area. That blue truck is the loaner truck we had while ours was in the shop being repaired.
This week was special at devotions. Shelia & Frank gave everyone a silver give thanks token with a cross on the opposite side. Les gave everyone a special cross that he had handmade from wood with the shape of a hammer & saw as the cross. Nancy & Dennis gave everyone a bag of Thanksgiving Blessings mix.

No comments:
Post a Comment